Project Name
High Voltage Distribution System
High Voltage Distribution System
Location
Jabalpur
Jabalpur
Duration
24 Months
24 Months
Approx Value
8500 Lacs
8500 Lacs
HVDS Project, Jabalpur
HIGH VOLTAGE DISTRIBUTION SYSTEM: in JABALPUR (O&M) & SIHORA Dn. Jabalpur District ,rural electrification works – 11 KV transmission and distribution network – 11 KV line, distribution substation, preparation of profile, drawings, LT line, erection of 8/9 meter PSC pole for 11 KFV/LT line line including backfilling with soil and broken bricks, compaction, fixing og V cross arm, pole top bracket and other accessories, Erection of 9 mtr 400 kg PSC pole for distribution substation including backfilling, stringing 11 Kv 3 phase 3 wire line incl fixing of insulators, hardware fittings and conductor accessories, jumpering at tension pole, jointing of conductors, figing of PG clamps & connectors, anti climbing devices, danger plate etc. Stringing 11 KV 2 phse 2 wire by AAA conductor; stringing of 3 ph 4 wire LT line by AAA conductgor, stringing of1 ph 2 wire LT line by AAA conductorl Stringing of 11 KV AB cable, Dismantling conductor, insulators, hardwares, erection of 11 KV / 433-250 V 25 KA 3 ph distribution transformer, erection of 11 KV 400A 3 pole / 2pole AB switch on 11 KV line, erection of stay set, earthhing sets, cradle guard for 11 kv, LT 3 phase, service connection, light point wiring for 40/60 W etc.